TECHNICAL SPECIFICATIONS OF MATERIALS USED
Wall Height: 2.80 m
Wall Thickness: External Wall: 10 cm / Internal Wall: 6 cm
Exterior: Plain appearance
Exterior Door: Steel
Interior Door: American Door
Roof Insulation: 10 cm Mineral Glass Wool, OSB and Membrane
Windows: Adopen Double Glass + Double Opening + Fly Screen
Electrical Installation: Under plaster ( sockets, lamps to fuse box)
Plumbing: Under plaster
Paint: DYO brand
Air Conditioning and TV Installation
Sheet metal tape for kitchen cabinet
Stove Chimney apparatus
Covered Socket and Faucet for Veranda
If You Curious About How Our Prefabricated Houses Built, Check Out The video Below
Purchasing a Prefabricated House Abroad: A Step-by-Step Guide
Step 1: Prefabricated house project plan and pricing
The project and features that the customer requests are mutually discussed and designed. According to said design a price offer is presented by the prefabricated company.
Payment is made after agreement on the price.
From the total payment, 70-80% required to be paid at the contract signing and the remaining payment must be paid 2-3 days in advance of shipment (Transportation and Customs clearance must be covered and planned by the buyer).
Step 2:
Obtaining a prefabricated house license must be covered and planned by the Buyer according to country and regulations
Step 3:
Prefabricated house shipment, manufacturing and installation.
The manufacturing process is completed in 7 to 10 days.
Before installation of the plan, the slab on grade must be ready to proceed, ground concrete must be executed in accordance with the ground concrete plan given by the prefabricated company.
The prefabricated house arrives at the installation site. Assembly team is required by buyer.
If requested, the following procedure can be applied with a Supervisor (the Supervisor´s fee (200 USD/day/person) being borne by the buyer).
Transportation of the supervisor (to the place of installation), accommodation, food expenses and visa procedures will be covered by the buyer.
Tools and equipment shall be made available by the Buyer for the installation (list will be sent by firm).
Along with the supervisor, 3 or 4 support personnel should be provided by the buyer according to the size of the building.
Since the Buyer is responsible for the shipment of the products, the insurance of the products depends on the buyer´s choice of shipping methods.
Construction equipment such as Crane, Forklift, JCB may be required to lower the materials onto the concrete. If these are not available, the Buyer must transport these products onto the concrete with their own personnel.
Regarding the installation, a standard 95 m2 to 100 m2 building can be transported with 1 truck and installation can take between 8 and 12 days within the team Dec
The Door + Roof + Window + Interior Paint + Exterior Paint + Electrical installation + Plumbing + Sockets + Lamps + Electrical Fixtures + Up to the fuse box and Vitrified products are included in price.
After the advanced rough installation is finished, the buyer can have fine screed workmanship on the floor and parquet and tile workmanship done.
Screed with a thickness of 3-5 cm should be thrown on the concrete when the installation is completed which is done buy the buyer.
If there are overflow shares outside the building, fish ridge (oily screed) should be applied to this concrete area outside the building which is done buy the buyer.
Paint that has been decided will be sent but paintwork is not included by the prefabricated firm.
After this process the buyer can carry on with the interior design and details such as kitchen cabinets, ceramic applications, installation of sanitary ware products, parquet coating for the floor.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
A prefab house, also known as a prefabricated house or modular house, is a dwelling that is manufactured in advance in a factory setting and then transported to the construction site for assembly. Here are some features of prefab houses:
Rapid Construction Process: Prefab houses are built quickly due to their off-site manufacturing process. This allows for swift delivery to the homeowner.
Cost Efficiency: Prefab houses offer a more economical option as they benefit the advantages of mass production. They can be purchased at a lower cost compared to traditional on-site construction.
Portability: One of the advantages of prefab houses is their ability to be transported. They are designed to be disassembled and relocated, providing flexibility for homeowners who may need to move or relocate their dwelling.
Environmentally Friendly: Prefab houses generate less waste as they are constructed in a controlled factory environment. Additionally, they can be designed with energy-efficient insulation and renewable energy systems to enhance sustainability.
Design Flexibility: Prefab houses offer various design options. They can be customized to meet specific needs and preferences, allowing for different sizes, floor plans, and materials to be incorporated.
Durability: Prefab houses are often constructed using durable materials, ensuring long-lasting performance and structural integrity.
Technological Integration: Modern prefab houses can be equipped with advanced technological features to enhance comfort and convenience. This may include integrated electrical systems, heating and cooling systems, and communication systems.
Energy Efficiency: Prefab houses prioritize energy efficiency through high-quality insulation and energy-saving features. Well-insulated walls, roofs, and windows help reduce energy consumption and create a sustainable living environment.
Prefab houses are a popular housing choice due to their rapid construction process, cost efficiency, portability, environmentally friendly features, design flexibility, durability, technological integration, and energy efficiency.